I read somewhere a while ago that the were going to extend the train line from Fuengirola further south. Does anyone know when they will be doing this and which towns you will be able to visit from it.
I love the train from Fuengirola and have visited most of the places from there to malaga.
They won't be starting work on the extension to Marbella until the existing line is twin-track all the way from Malaga Centro to Fuengirola. This phase also includes making several of the station platforms longer to accommodate longer trains. When this is complete, trains will run every 15 minutes instead of every 30 at present.
The Fuengirola to Marbella section is scheduled to open in 2014 but I can't see them completing it by them. 2007 cost estmates were 130 million euros due to vast sections of the new line going underground.
A.M.
The Fuengirola to Marbella section is scheduled to open in 2014 but I can't see them completing it by them. 2007 cost estmates were 130 million euros due to vast sections of the new line going underground.
A.M.
The twin tack is very much 'work in progress' .... Mike didn't know trains would runs every 15mins, thats great news..roll on completion
Thanks Mike and Daveanne, great to know that there will be more trains running from Malaga.I will look forward to new track in the future, I much prefer the train to the bus.
Any idea when Malaga cento station will reopen ? Also can you get the train into Malaga at the moment or do you need a taxis for the last bit? And was this way Malaga centro has been closed ?
Any idea when Malaga cento station will reopen ? Also can you get the train into Malaga at the moment or do you need a taxis for the last bit? And was this way Malaga centro has been closed ?
The Malaga Centro upgrade is a major bit of engineering. The station platforms are being lengthened and the tunnel widened to accomodate twin tracks. The trains currently terminate at the RENFE mainline station and its a walk of a half a kilometre or so into town. There is a shuttle bus service. The original announcement said that Centro would be closed for about 18 months so it should be well on the way to being completed.
The railway line is planned to be extended in stages all the way to Algeciras but I guess I'll be a very old man by the time it is completed !
The railway line is planned to be extended in stages all the way to Algeciras but I guess I'll be a very old man by the time it is completed !
Mike, are they planning to convert the airrport station to an underground one?
The underground station at the airport was scheduled to open in April 2010 but I haven't seen any evidence that any work has started on it yet. Apparently the money to build it was only approved towards the end of last year.
Post a Reply
Please sign in or register an account to reply to this post.
Similar Topics
-
Train timetables Main line and Suburban
Posted by Aslemma in Tunisia Discussion Forum
-
Le petit train jeune or the little yellow train
Posted by Anonymous in France and Channel Hopping Discussion
-
checkin on line
Posted by shaz in General Holiday Enquiries, Hints and Tips
-
booking on-line
Posted by roymoz in Turkey Discussion Forum
-
Booking on line...
Posted by Harro in General Holiday Enquiries, Hints and Tips