Just to let you know I have uploaded a whole bunch of new pictures at my webspace http://thomasallen.spaces.live.com
Photos of some of the current construction projects, civic works projects and some pretty pictures of the beaches.
Also, in the album before, some pictures from France.
Dave.
I have uploaded a few pictures to show progress on the lift/elevator plus some other odd items. Also included are some pictures of the sunny beaches, to cheer up those of you suffering the northern European weather.
thanks a bunch T.A. just what i needed to feel more depressed!
See you soon! I am in Tonbridge now where it is overcast, gloomy but horribly humid.
ooh i use to live thereI am in Tonbridge
While I was there I was told that a drain running under my flat had collapsed.
Hence delay in getting some new pictures.
So I went out Sunday morning and ther are some new pictures at the usual place http://thomasallen.spaces.live.com and I have included some blue sky and blue seas to cheer up those of you booked with XL or otherwise not here.
Was it hot today - still 80F at 7pm.
do you know what the new structure at the marina is ? it looks like a concrete water park !!!
There is/was a plan to build a sort of promenade round from the marina along the base of the cliff and coming out on the beach near where the lift is being built. Maybe it is a part of that. There is a narrow rocky path for some of that route already but it is dangerous.
Now that I am back indoors as it were I might take a closer look around next weekend.
yes that confirms what i had heard, that it was eventually going to go around the cliffs and meet up with the beach next to the lift, making the marina more accessible.when i was there in august i tried to see if you could get round but it was too dangerous, so if you do attempt to investigate further please be very careful.
you wimp T.A. , what about parascending around to get some arial views?
I was planning to cycle round to the far side of the marina this afternoon and use me zoom lens but it keeps raining. A day or two maybe.
Cubby, it's been more than a day or two, have you not got on yer bike yet? I would love to see how the Marina to the old town is coming on as I won't be back until April
Also, I learned that the same slippery and dangerous paving is to be installed in the whole area, to replace the existing black and white calcada or cobblestones.
Make sure your travel insurance is up to date next year. Whoever thought of that idea is a serious idiot.
The work will of course enforce the closure of many bars and restaurants. I hope to keep every one up to date in the usual way during the winter months.
The work was due to start on 29th September but was delayed because of the heavy rain and subsequent flooding. Completion is scheduled for 11th February 2009. There is a budget of 410,000 Euros.
The work affects Rua Candido dos Reis, Travessa Candido dos Reis, Rua de Santana and Rua de São Gonçalo de Lagos.
All the underground infrastructure - water supply, drains, sewers and electricity will be replaced and renewed. Street lighting will be renewed. Telephone cables will be moved underground,
The whole area will be re-paved with a mixture of the existing type of calçada (cobbles) and larger slabs. Where there is a steep slope, steps will be added.
The Travessa will be completely covered with a kind of giant sunshade, which I have seen in Seville.
New 'street furniture' eg seats will be installed.
Obviously a majority of businesses in that area will be closing down shortly for the duration.
This work is in addition to the similar activity taking place in the Rua 5 Outubro - the road to the tunnel. At present I do not know a firm start date for that.
Camera is poised and ready to record events as they unfold.
Cubsur, thank you so much for keeping us informed. You are a star!
It is not known if the closures will apply over Christmas and New Year. Nevertheless, intending visitors to the old town area should expect some disruption.
I shall do my best to keep you all up to date.
I have just uploaded some pictures taken this afternoon, Wednesday 22 October, showing the new work now under way in various areas of the old town section of Albufeira.
A new small set of pictures taken on Sunday afternoon, 2nd November, is available for your perusal at
Album 1 - Albufeira Eden Resort and Quinta da Bolota developments plus a few shots of the work around town and of the new roads near the stadium.
Album 2 - Lagos city centre road and parking works plus cranes and gloomy skies.
Album 3 - in memory of the fishing industry at Vila Real.
Any comments, thoughts, views gratefully received through this forum.
http://thomasallen.spaces/live.com
Post a Reply
Please sign in or register an account to reply to this post.
Similar Topics
- What's the old town, albufeira like in may?
- Old Town Albufeira????
-
albufeira.apartments near old town
Posted by nades in Algarve/Portugal/Madeira/Azores Discussion Forum
-
Albufeira old town rooms
Posted by klider in Algarve/Portugal/Madeira/Azores Discussion Forum
-
NEW YEARS EVE ALBUFEIRA OLD TOWN
Posted by jayjan in Algarve/Portugal/Madeira/Azores Discussion Forum